Radiography: manual x-ray film development in Horses (Equis) | Vetlexicon
equis - Articles

Radiography: manual x-ray film development

ISSN 2398-2977

Contributor(s) :


Introduction

Requirements

Materials required

Minimum equipment

  • Light-proof room.
  • Three trays or tanks for chemicals
    • Developer.
    • Fixer.
    • Wash water.
  • Film holders either channel hangers or clip hangers if using vertical processing tanks.

Ideal equipment

  • Tank heaters with thermostat to maintain developer at correct temperature.
  • Safelight - light of different wavelength (color) than sensitivity of film .
  • Dark room divided into dry and wet areas.
  • Timer with audible signal to allow accurate timing of development.

Minimum consumables

  • Fresh chemicals : developer and fixer.

Preparation

Technique

Approach

Step 1 - Prepare darkroom

  • Turn on safelight and turn off mainlight.
  • Ensure that door is locked and room is light -tight.
  • Allow a few minutes for eyes to become accustomed to the dark.
  • Stir the developer and fixer to equalise the temperature and distribution of chemicals throughout the solutions.
  • Developer temperature should be 20°C.

Step 2 - Remove film from cassette

  • Under safelighting remove the film from the cassette - handling only by a corner.
  • Close cassette to prevent splashing or dirtying of screen.
  • Label film if appropriate ie with darkroom identification marker.
  • Attach to a film hanger.

Core procedure

 

Step 1 - Developing

 
  • Immerse film smoothly in the developer solution and note time or set timer.
  • Agitate film up and down to remove any air bubbles from film which would prevent development of that area.
  • Film should remain in developer for 4 minutes.
    Ensure that film is not in contact with adjacent film or side of tank during this process
  • Agitate the hanger with an up and down motion to ensure that the film keeps coming into contact with fresh developer.
  • At end of 4 minutes remove film from tank.
  • Development time for non-screen film should be increased by about 1 minute.
    Do not allow developer solution to run off film back into developer tank

Step 2 - Rinsing

 
  • Place the film in rinsing tank for at least 10 seconds agitating the hanger throughout.
  • Remove film from water.

Step 3 - Fixing

 
  • Immerse the film in the fixer tank.
  • After approxiamtely 30 seconds film emulsion should clear.
    Do not expose film to white light until emulsion has cleared
  • Standard film should remain in fixing tank for at least 15 minutes.
  • Non-screen film has thicker emulsion and fixing may take several minutes longer.
    Film may be viewed initially to assess quality after emulsion has cleared

Step 4 - Washing

 
  • After full fixing place the film in wash compartment for at least 30 minutes.
    Water must be flowing continuously or washing will not be efficient

Step 5 - Drying

 
  • Remove film from channel hangers to dry to avoid the edges of the film remaining wet.
  • Film should be hung in low-humidity, dust free environment with circulating air.
  • Film should not be read finally until emulsion is completely dry.

Exit

 

Step 1 - Reload cassette

 
  • Ensure that hands are clean and dry.
  • Double-check that door is locked and that no white light is entering dark room.
  • Open cassette and leave on work surface.
  • Remove film from film box or hopper.
  • Place film on screen in open cassette, taking care that film is not trapped at edge of cassette.
  • Replace lid on open box of film or close hopper.
  • Close cassette and ensure clips shut tightly.
  • Recheck film box or hopper to ensure that they are light-tight before opening darkroom door or turning on light.

Aftercare

Outcomes

Reasons for treatment failure

  • See Radiography: film faults   Radiography: film faults  .
  • Film incorrectly stored prior to exposure.
  • Rough handling of film.
  • Room not light-tight   →   fogging of film.
  • Processing performed at wrong temperature.
  • Solutions should be replaced and tanks cleaned at approximately 3 months intervals.
  • Insufficient developing, fixing or washing time allowed.

Further Reading

Publications

Refereed papers